Your selection
Clear selectionLeave the work to our dedicated Account Managers.
This search will return exact matches only. For best results:
Please note that only low-res files should be uploaded.
Any images with overlay of text may not produce accurate results.
Details of larger images will search for their corresponding detail.
Drag file here
Upload
Processing search results
Waiting for update..
Error:
Add up to 5 colors and slide the dividers to adjust the composition
Add keywords to refine your results
Searching for a particular field
Field | Search term | Example |
Asset title | title: | title:pony |
Asset title and keywords | ~ | ~pony |
Asset description text | description: | description:london |
Agency prefix | prfx: or $ | prfx:lal or $LAL |
Asset id | imageid: | imageid:250297 or imageid:[2500 TO 4000] |
Agency name | coll: | coll:history |
Medium | medium: | medium:oil |
Century | century: | century:20th |
Keywords | kw: | kw:dog |
Artist name | artist: or ? | artist:monet or ?monet |
Artist nationality | ?? | ??French |
Creator ID | creatorid: | creatorid:37 |
Location | loc: or @ | loc:exeter or @exeter |
Classification | class: or # | class:57 or #57. Use # for unclassified assets |
Year | year: | year:1850 or year:[1700 TO 1800] |
Dimension [pixels] | Dimension in 300dpi [mm] | File size [MB] | Online Purchase | |
---|---|---|---|---|
Large | 8105 × 2674 px | 686 × 226 mm | 8.3 MB | |
Medium | 1024 × 338 px | 87 × 29 mm | 518 KB |
We partner with the world's leading museums, galleries and artists, so you have access to the highest-quality imagery.
Our teams can help you find the perfect content and take care of all of the copyright and licensing requirements.
Bridgeman Images
77 Sands Street, 6th Floor
Brooklyn, NY 11201
United States
T: +1 212 828 1238
© Copyright 2024 Bridgeman Art Library Limited. Registered in England and Wales as company number 01056394.